Our Construction Case Studies:

14 June OI Glass Silos 005.jpg

Construction - Case Studies

  • Holcim Fine Powder Silos
    • Project:Holcim Fine Powder Silos
    • Client:Holcim New Zealand
    • Year:2013
    • Service Engineers provided Holcim with two 25.6m high, 10m diameter CST steel bolted silos for their Lyttelton cement depot. These silos were placed on 6m high concrete supports giving a total height of 31.6 meters. Designs for the
  • Queens Wharf Passenger Gangway, Ports of Auckland
    • Project:Queens Wharf Passenger Gangway, Ports of Auckland
    • Client:Ports of Auckland
    • Year:2013
    • Service Engineers was appointed as the main contractor to design, construct and install a new Passenger Gangway to be used on Queens Wharf.  The design had to be consistent with the existing Gangway on Princes Wharf and the works were
  • OI NZ AK4 New Facility
    • Project:OI NZ AK4 New Facility
    • Client:OI Asia Pacific Ltd
    • Year:2010
    • The main contract, awarded to United Group Ltd, was the contruction of a new glass bottle production line at Penrose.  Service Engineers Limited was sub-contracted by Kalmar Construction to supply, fabricate and erect all structural steel for the batch
  • Viterra Grain Feed Mill
    • Project:Viterra Grain Feed Mill
    • Client:Viterra (NZ) Ltd
    • Year:2010
    • Service Engineers Limited was subcontracted by Viterra to design, develop, fabricate, install and commission product line and steam line pipework for a new Grain Feed Mill plant.   Service Engineers Limited's scope also included the installation of pumps, heat trace,
  • Buildings
    • Project:Buildings
    • Client:Various
    • Year:Various
    • Service Engineers Limited has focused its efforts over the years of only getting involved in more complex building structures requiring a high degree of trademans' skill and input. Some of the buildings that Service Engineers has been involved in are: