Our Petro-Chemical Case Studies:

Petro Chem Pipework (29).JPG

Petro-Chemical - Case Studies

  • Fuel Pipeline installation
    • Project:Fuel Pipeline installation
    • Client:Undisclosed
    • Year:2008/9
    • Service Engineers Limited completed the installation of fuel and water lines in painted carbon steel, stainless steel and PE with associated valves and actuators, belows, supports, and tie-ins to existing and new equipment.
  • Underground Fuel Storage Tank installation
    • Project:Underground Fuel Storage Tank installation
    • Client:Undisclosed
    • Year:2008
    • Service Engineers Limited completed the construction of 12 fuel storage tanks insitu in an underground location. All tanks were constructed to ASNZ 1692 and API650 and ranged in size from 30kl to just over 1mil litres.
  • Heavy Fuel Oil Installation
    • Project:Heavy Fuel Oil Installation
    • Client:Fiji Electricity Authority
    • Year:2007/8
    • Complete design build project incorporating civil, structural, mechanical, electrical and control system works.  Civil works involved: clearing site; stabilisation of the ground; foundations and construction of bunded area; and access roading.  Structural works covered the kits set construction of 1