Waste Water

  • Mangere WWTP CAASU
    • Project:Mangere WWTP CAASU
    • Client:Watercare Services Limited
    • Year:2010-2011
    • The project primarily involved installation of 2 large client supplied centrifuges and 7 spiral conveyor systems at New Zealand's largest Waste Water Treatment Plant at Mangere. This included design, supply and installation of sludge and polymer pumps and associated
    • Project:NSWWTP De-Watering Building
    • Client:Watercare Services Limited
    • Year:2010
    • The main contract was awarded to Service Engineers Limited who subcontracted Coastline Construction Group for all civil and building work, and Current Electrical for electrical works. The majority of the contract was civil based and allowed for a new entrance
    • Project:NSWWTP Pond Hydraulics
    • Client:Watercare Service Limited
    • Year:2010
    • The main contract was awarded to Service Engineers Limited who subcontracted Coastline Construction Group for all civil and building work, and Current Electrical for electrical works. The contract involoved all works required for raising the Outlet Structure of Secondary Settling
  • Project Hobson - Heat Exchangers
    • Project:Project Hobson - Heat Exchangers
    • Client:Fletcher Construction Company for Watercare Services Limited
    • Year:2009
    • This project was a joint venture between The Fletcher Construction Company (FCC) and McConnel Dowell. Service Engineers Limited worked as a subcontractor to FCC. The main contract was to construct a 3.5km tunnel under the estuary from Hobson Bay
  • Army Bay WWTP Solids Thickening Upgrade Stage Two
    • Project:Army Bay WWTP Solids Thickening Upgrade Stage Two
    • Client:Rodney District Council
    • Year:2009
    • This contract included supply, fabricate, install and commission a fully operational WAS thickening facility at Army Bay WWTP. This included the supply, install and commissioning of all pipework, Gravity Belt Thickener (client supplied), pumps, valves etc. Service Engineers Limited was
  • NSWWTP - Sludge Thickening & Blending Upgrade
    • Project:NSWWTP - Sludge Thickening & Blending Upgrade
    • Client:North Shore City Council
    • Year:2009
    • Service Engineers Limited was the main contractor on the project, subcontracting the electrical work to Current Electrical and the civil/construction work to Coastline Construction Group Ltd and Contract Landscapes. The contract included supply, install and commission all pipework, tanks,
  • Warkworth WWTP Peak Flow upgrade
    • Project:Warkworth WWTP Peak Flow upgrade
    • Client:Rodney District Council
    • Year:2008/9
    • The focus of this contract was to improve the plants ability to cope with Peak / Storm flows. The design was undertaken by Harrison Grierson. As head contractor Service Engineers contract included; installation of the Acti-flow (Veolia proprietary storm flow
  • Beachlands WWTP upgrade
    • Project:Beachlands WWTP upgrade
    • Client:Fulton Hogan - Munukau Water
    • Year:2008
    • This contract covered major upgrade works to an existing airated pond system plant. It included the addition of a new inlet screen and a tertiary disc filter. The design was by Opus. Service Engineers Ltd's contract included the installation
  • Rosedale Stage 5 PST Upgrade
    • Project:Rosedale Stage 5 PST Upgrade
    • Client:Fulton Hogan - North Shore City Council
    • Year:2007/8
    • Service Engineers Limited has been involved in many project for the NSCC at the Rosedale site which operates an MLE treatment system. This project however, was the most sizeable undertaking to date. Our scope in the "design build" partnership arrangement
  • Turangi WWTP
    • Project:Turangi WWTP
    • Client:HEB Construction - Taupo District Council
    • Year:2006
    • This MBR plant was designed by Harrison Grierson and was largely a green fields build. Service Engineers Ltd was responsible for the installation of proprietary mechanical equipment supplied by the principal such as the MBR modules and the inlet screen.
  • Army Bay WWTP upgrade
    • Project:Army Bay WWTP upgrade
    • Client:Rodney District Council
    • Year:2005
    • This project covered a major upgrade of the existing site. SKM were responsible for the overall design of the 2 new SBR's into the existing system. Service Engineers took on a design build role for the complete mechanical component
  • Tirau WWTP Upgrade
    • Project:Tirau WWTP Upgrade
    • Client:South Waikato District Council
    • Year:2005
    • Service Engineers contract covered refurbishment and upgrade of existing WWTP including supply and installation of all proprietary equipment and MBR's including stainless, carbon steel, and plastic pipe work.
  • Rosedale WWTP Peak Flow & Gravity thickeners
    • Project:Rosedale WWTP Peak Flow & Gravity thickeners
    • Client:Fulton Hogan - North Shore City Council
    • Year:2004
    • Service Engineers was sub-contracted to Fulton Hogan for the complete supply and installation of all mechanical components. There were two stages to the works.Stage 1 - the Peak Flow System.Stage 2 - the Gravity Thickeners.The two gravity thickeners (
  • Mangere WWTP Balance of plant contract
    • Project:Mangere WWTP Balance of plant contract
    • Client:Watercare Services Ltd
    • Year:2002
    • Service Engineers contract covered the following; design and build of ancillary systems for the co-generation upgrade including stainless and plastic piping systems for digester and natural gas. Selection, supply and installation of Gas blowers, boilers, gas dryer, pumps, etc.
  • Mangere WWTP other contracts
    • Project:Mangere WWTP other contracts
    • Client:Watercare Services Limited
    • Year:2003 - 2009
    • Other projects completed on the Mangere site over the years: 2003 - Gas Burner upgrade. 2003 - Siloxane removal system for digester gas. 2003 - HS2 removal system. Design build of 2 large stainless steel pressure vessels. 2005 - Fairview pump station. Supply and
  • Rosedale WWTP Other contracts
    • Project:Rosedale WWTP Other contracts
    • Client:North Shore City Council
    • Year:1997 - 2009
    • Other projects completed on the Rosedale site over the years: 1997 - Inlet works upgrade Mechanical. 1999 - Design and Build 2 x 22m diameter floating gas holder digester covers and all associated blowers, heaters, pumps and piping. 2000 - Sludge dewatering upgrade.