- Client: Rodney District Council
- Year: 2005
This project covered a major upgrade of the existing site. SKM were responsible for the overall design of the 2 new SBR's into the existing system.
Service Engineers took on a design build role for the complete mechanical component for the job covering; aeration, mixing, pumping and piping and included the electrical works which was sub contracted to Current Electrical.