Pipe work

Pumps & Pipe Installation (9).jpg

Service Engineers Limited’s pipe work capability is second to none and we are well regarded as specialists in this field. Whether its for:

  • water or waste water,
  • petro chemical,
  • power generation,
  • food and beverage industry,
  • pressure or light gauge,
  • Large or small bore,
  • Ductile Iron, Stainless steel or Carbon steel.

We have the in house skills to design route runs, supports, anchor points and tie ins to existing plant or piping. Our welders are coded to ASME B31.1 and have developed numerous procedures over the years to handle the commercial, specified (such as LPG AS/NZ 1596) and in some cases statutory requirements of any contract. Spooling is carried out either in the controlled space of the workshop or on site / insitu.

Pipe work - Case Studies

  • Ruakaka WTP upgrade
    • Project:Ruakaka WTP upgrade
    • Client:Whitaker Civil - Whangarei District Council
    • Year:2007/8
    • This was an upgrade project to an existing treatment plant. It involved taking plant capacity to 12000m3 /day and the installation of 3 new filters. In order to achieve this a new dosing system was installed. Service Engineers Limited scope
  • Mangere WWTP other contracts
    • Project:Mangere WWTP other contracts
    • Client:Watercare Services Limited
    • Year:2003 - 2009
    • Other projects completed on the Mangere site over the years: 2003 - Gas Burner upgrade. 2003 - Siloxane removal system for digester gas. 2003 - HS2 removal system. Design build of 2 large stainless steel pressure vessels. 2005 - Fairview pump station. Supply and
  • Heavy Fuel Oil Installation
    • Project:Heavy Fuel Oil Installation
    • Client:Fiji Electricity Authority
    • Year:2007/8
    • Complete design build project incorporating civil, structural, mechanical, electrical and control system works. Civil works involved clearing site, stabilisation of ground, foundations and construction of bunded area, access roading. Structural works covered the kits set construction of 1 x 1.
  • Fuel Pipeline installation
    • Project:Fuel Pipeline installation
    • Client:Undisclosed
    • Year:2008/9
    • Service Engineers Limited completed the installation of fuel and water lines in painted carbon steel, stainless steel and PE with associated valves and actuators, belows, supports, and tie-ins to existing and new equipment.