Pipe work

Service Engineers Limited’s pipe-work capability is second to none and we are well regarded as specialists in this field.  Whether it is for:

  • water or wastewater
  • petro chemical
  • power generation
  • food and beverage industry
  • pressure or light gauge
  • large or small bore
  • ductile iron, stainless steel or carbon steel

We have the in-house skills to design route runs, supports, anchor points and tie-ins to existing plant or piping.  Our welders are coded to ASME B31.1 and have developed numerous procedures over the years to handle the commercial, specified (such as LPG AS/NZ 1596) and in some cases statutory requirements of any contract.  Spooling is carried out either in the controlled space of the workshop or on-site/insitu.

Pipe work - Case Studies

  • Kerepihi WTP upgrade
    • Project:Kerepihi WTP upgrade
    • Client:Hauraki District Council
    • Year:2012
    • SEL was subcontracted by Brian Perry Civil to undertake work at the Kerepehi Water Treatment Plant.  This contract was for the supply and installation of valves, Hambaker NZ Penstocks, Dewa scraper systems and the fabrication and installation of the associated
  • Waila and Tamavua Water Treatment Plants Upgrade
    • Project:Waila and Tamavua Water Treatment Plants Upgrade
    • Client:Fletcher Construction Fiji
    • Year:2010-2011
    • The main contract was to upgrade Waila and Tamavua Water Purification Plants servicing the greater Suva district, awarded to Fletcher Construction Fiji.   In February 2010, Service Engineers Limited set up a fully owned subsidiary company in Fiji called Water and
  • Ruakaka WTP upgrade
    • Project:Ruakaka WTP upgrade
    • Client:Whitaker Civil - Whangarei District Council
    • Year:2007/8
    • This was an upgrade project to an existing treatment plant. It involved taking plant capacity to 12000m3 /day and the installation of 3 new filters. In order to achieve this a new dosing system was installed. Service Engineers Limited's
  • Army Bay Sludge Tank Replacement
    • Project:Army Bay Sludge Tank Replacement
    • Client:Watercare
    • Year:2013
    • Service Engineers was appointed as the main contractor for works at the Army Bay site.  This project was the most recently completed work by SEL at Army Bay, as multiple projects have been completed in the past, in an on-
  • Helensville WWTP upgrade
    • Project:Helensville WWTP upgrade
    • Client:Watercare
    • Year:2013
    • SEL was appointed as the main contractor, which covered all Civil, all Electrical, all SCADA and PLC work.  This plant was a live plant and had to be kept live during the entire course of the project. The project also
  • Hillsborough Pumping Station Pipework Replacement
    • Project:Hillsborough Pumping Station Pipework Replacement
    • Client:Watercare Service Limited
    • Year:2013
    • Hillsborough Pump Station is located on the shore of Manukau Harbour, pumping the flow from the Onehunga Branch Sewer up to a connection on the Western Interceptor Sewer at the entrance to the Manukau siphon.   The station was constructed in
  • Mangere WWTP other contracts
    • Project:Mangere WWTP other contracts
    • Client:Watercare Services Limited
    • Year:2003 - 2009
    • Projects completed on the Mangere site over the years are as follows:   2003 - Gas Burner upgrade. 2003 - Siloxane removal system for digester gas. 2003 - HS2 removal system. Design build of 2 large stainless steel pressure vessels. 2005 - Fairview pump station.
  • Fuel Pipeline installation
    • Project:Fuel Pipeline installation
    • Client:Undisclosed
    • Year:2008/9
    • Service Engineers Limited completed the installation of fuel and water lines in painted carbon steel, stainless steel and PE with associated valves and actuators, belows, supports, and tie-ins to existing and new equipment.
  • Heavy Fuel Oil Installation
    • Project:Heavy Fuel Oil Installation
    • Client:Fiji Electricity Authority
    • Year:2007/8
    • Complete design build project incorporating civil, structural, mechanical, electrical and control system works.  Civil works involved: clearing site; stabilisation of the ground; foundations and construction of bunded area; and access roading.  Structural works covered the kits set construction of 1