NSEC Seating and Servery

  • Client: North Shore Events Centre Trust
  • Year: 2010

The contract was to install new retractable seating on the East side of the Events Centre, as well as upgrade the existing Servery on the South side. Max Ward was subcontracted to supply the seating and Service Engineers for the structural steel components. Wormalds subcontracted for all fire control modifications required and Coastline Construction Group worked on the Servery upgrade.

 

Service Engineers Limited's scope was to fabricate and install the structural steel for the permanent fixed structure associated with the seating.

 

The contract had a tight deadline and was completed over Christmas and January for completion before the first Breakers game of the year in February.  The contract required some height work and the Events Centre floor had to remain undamaged. The contract was finished on time and without incident.