- Client: Watercare Services Ltd
- Year: 2016
Service Engineers was contracted by Watercare to install fans and ducting around the plant to enhance environmental performance and control odour issues in the Bio-Solids building at Mangere WWTP. Installation of mechanical plant including pipework, pumps, valves, access structures etc.
Tie-ins to existing equipment during planned shut-down windows, which were coordinated with the principal to maintain plant operations as much as possible. Sub-contractors were utilized for civil and electrical works involved in the project and managed by SEL.
After the completion of this project, Service Engineers was invited to supply a new access platform for the bio-solids building which was installed in late 2018.